Construction and modification projects generally fall into the following categories under HOA contractor rules:
Decorative Projects: This includes activities such as painting, wallpapering, and the installation or removal of carpeting. These decorative projects typically require advance notification to Management, but may not necessitate a formal architectural review.
Modification Projects: These encompass procedures like cabinet replacement, plumbing-fixture or appliance installation, alterations to plumbing, electrical, ventilation, fire-protection, telephone systems, wall modifications, hard-surface flooring installation, built-in entertainment systems, and structural changes. For these modification projects, it is essential to notify Management in advance, and they may also require Board approval, City permits, architectural review, inspections, fees, and a performance deposit, in accordance with the construction rules.
Major or Common-Element Projects: This includes significant changes such as combining units, relocating unit entrance doors, modifying common or limited common elements, and replacing individual HVAC equipment. These major projects necessitate both Management and Board approval, applicable inspections, fees and deposits, and may require additional legal agreements or amendments to the Condominium Documents.
Project classifications and requirements depend on the proposed scope of work. Co-owners must adhere to contractor guidelines by contacting the Management Office before hiring contractors, purchasing materials, or scheduling any work to determine the applicable requirements.